PIPELINE FABRICATION PROJECTS
Reference List |
| Company |
Work Performed |
Northern Border
Gas Transmission Company
1111 South 103 Street
P.O. Box 3330
Omaha, NE 68103 |
Low Temperature High Yield Pipeline
Launchers and Receivers |
Iroquois Gas Transmission System
One Corporate Drive
Suite 606
Shelton, CT 06484 |
Main Line Pipeline
Valve Assemblies with External Urethane
Coating |
Great Lakes Gas Transmission Company
One Woodward Avenue
Suite 1600
Detroit, MI 48226 |
36" and 42" Fabricated Piping
for Four (4)
Gas Compressor Stations |
Great Lakes Gas Transmission Company
One Woodward Avenue
Suite 600
Detroit, MI 48226 |
Two (2) Skid Mounted Metering Stations |
Compania Minera Disputada
Des Las Condes
Santiago Chile
c/o Exxon Research and Engineer Co.
Quality Assurance Section
ISOII-10 East
P.O. Box 2958
Baytown, TX 77522-2958 |
Five (5) Sets of Large Diameter Piping, 65,000
Yield Strength 600#, 900#,
and 1500# Rated,
Flanges Slurry Pipeline Assemblies |
ANR Pipeline
15170 Commerce Drive
Dearborn, MI 48120-1272 |
Compressor Bottles and 36" Pig Launchers and
Receivers for the
Blue Lake Project |
Consumers Gas
P.O. Box 650
Scarborough, Ontario
CANADA M1K 5E3 |
24" Launcher and Receivers with a Retractable
Tray and a
Exterior Tray |
Cascade Natural Gas Corporation
P.O. Box 24464
Seattle, WA 98124 |
6" Expansion Loops
|
Portland Pipeline Company
P.O. Box 2590
South Portland, ME 04116 |
18" Launchers and Receivers |